Home / Insights / Guide

Jal Jeevan Mission and AMRUT 2.0: India's water missions explained for suppliers and investors

India’s two water missions have funded the largest drinking water build-out in its history: the Jal Jeevan Mission for rural households and AMRUT 2.0 for towns and cities. In 2026 the rural mission was extended to December 2028 with a much larger budget and a new focus on running water as a service. This guide sets out the numbers, how projects are bought, what has gone wrong, and where foreign suppliers and operators fit.

By UBR Infra · Updated 28 October 2026 · 31 sources

The two missions at a glance

Jal Jeevan Mission (JJM)AMRUT 2.0
CoversRural householdsUrban water supply and sewerage
MinistryJal Shakti (Department of Drinking Water and Sanitation)Housing and Urban Affairs
LaunchedAugust 2019[1]October 2021[2]
Runs toDecember 2028[3]Reported to end 31 March 2027[4]
Outlay₹8.69 lakh crore, of which ₹3.59 lakh crore central[3]Indicative ₹2.77 lakh crore, of which ₹76,760 crore central[2]
GoalA tap connection for every rural household[1]Universal tap coverage in 4,378 towns; sewerage in 500 cities[2]
Who tendersState water departments and boardsState agencies and city corporations

Both are centrally sponsored schemes: the centre shares the cost, but states and cities plan, tender and pay for the work. For a supplier, that means 28 states and thousands of towns with their own procurement, rather than one national buyer.

Jal Jeevan Mission: from 17% to over 80% coverage

When JJM began in August 2019, 3.23 crore of India’s 19.36 crore rural households, or 16.7%, had a tap connection.[1] By March 2026 about 15.80 crore households, or 81.6%, were connected, with more than 12.5 crore connections added since 2019.[3]

Eleven states and union territories, including Gujarat, Haryana, Punjab, Telangana and Himachal Pradesh, report full coverage.[5] The laggards are large states: in February 2025 Kerala, West Bengal, Jharkhand and Rajasthan were all at roughly 54–55%, Madhya Pradesh at 67% and Andhra Pradesh at 74%.[1] Rajasthan had reached 58% by January 2026.[5] Most of the remaining work, and much of the new money, is therefore concentrated in a handful of big states.

What changes in JJM to 2028

The Cabinet approved the extension on 10 March 2026. Total outlay rises to ₹8.69 lakh crore, with central assistance of ₹3.59 lakh crore, ₹1.51 lakh crore more than approved in 2019.[3] The mission now shifts from building connections to delivering a service:[3]

  • Utility approach. Schemes are to be run like utilities, with attention to supply hours, quality and maintenance.
  • Sujalam Bharat. A national digital framework gives each village a service area ID mapping its supply from source to tap.
  • Jal Arpan. Schemes are formally handed over to gram panchayats and village water committees.
  • Har Ghar Jal certification. A village can be declared fully covered only once the state confirms that operation and maintenance arrangements are in place.
  • State agreements. Each state signs a separate memorandum with the centre.

For foreign firms, this matters more than the headline money. The next phase rewards metering, monitoring, water quality, energy-efficient pumping and operating skills, not just pipe laying.

The money: budgets, delays and unpaid bills

Central JJM budget (₹ crore)Budget estimateRevised estimateActual
2023-2470,00070,00069,992
2024-2570,16322,69422,615
2025-2667,00017,000
2026-2767,670

Sources: Union Budget documents and PRS.[6][7][8]

The table shows the problem of the last two years. Central spending fell sharply in 2024-25 and 2025-26 while the extension was pending: PRS reports that the 2025-26 revised estimate was 75% below the budget, and that central grants were held back until the extension was approved.[8] Costs also rose, to more than ₹50,000 per household from 2023-24 against an earlier estimate of no more than ₹47,000.[8]

Contractors felt it. In October 2025 the industry body ASSOCHAM said certified bills had gone unpaid for 10–12 months, with dues of about ₹12,500 crore in Maharashtra and over ₹11,000 crore in Uttar Pradesh, and that new connections had fallen from 2.99 crore in 2023-24 to 0.94 crore in 2024-25.[9] These are the industry’s own figures, but they are consistent with the budget data. With the extension approved and ₹67,670 crore budgeted for 2026-27,[7] payments should recover, but any bidder should check a state’s payment record before committing working capital.

Quality, audits and enforcement

Rapid spending brought quality problems. By December 2025 the ministry had received 17,036 complaints of financial irregularities and poor work from 32 states and union territories, and action had been taken against 621 officials.[10] Penalties of ₹129 crore were imposed across seven states, most of it in Gujarat, and action was taken against 969 contractors and 153 third-party inspection agencies.[11]

State audits by the Comptroller and Auditor General point the same way. In Kerala, the CAG found coverage of 52% in March 2024, ₹3,578 crore of contractor bills pending and 2.14 lakh connections disconnected within a month of being made.[12] In Punjab it called the state’s 2023 claim of full coverage misleading.[13] A 2024 assessment found taps working in 87% of connected homes but fully functional in only 76%, mainly because of pump failures, damaged pipes and power problems.[8]

The response has been tighter inspection: payment now requires third-party certification, and since April 2025 each state inspects four randomly chosen schemes every month.[10] Inspection agencies need at least five years’ experience and ₹5 crore of turnover.[14] Foreign testing, inspection and certification firms with Indian subsidiaries can compete for this work.

How JJM projects are tendered

Each state runs its own procurement through a nodal department, usually the Public Health Engineering Department or a state water board or Jal Nigam. The CAG’s 2026 audit of Chhattisgarh shows a typical structure: a state water and sanitation mission chaired by the Chief Secretary sanctions schemes, while district missions led by the Collector can sanction and tender schemes of up to ₹5 crore.[15]

Scheme typeSourceWhat is tendered
Single-village schemeLocal groundwater, spring or surface waterBorewell or intake, overhead tank and village network, usually small local contracts[15]
Multi-village schemeSurface water from rivers or reservoirsIntake, treatment plant, transmission mains and reservoirs, tendered separately from village works, often as large EPC contracts with long operation periods[15]

The large multi-village contracts are where the volume is. Examples include L&T’s package covering 648 villages in Rajasthan’s Chittorgarh district, with SCADA and 10 years of operation;[16] its Prayagraj division contracts in Uttar Pradesh covering 1,900 villages;[17] and MEIL’s Amarajeevi Jaladhara scheme in Andhra Pradesh, with 186 MLD and 155 MLD treatment plants and 12 years of operation.[18]

AMRUT 2.0: the urban mission

AMRUT 2.0 was approved in October 2021 for 2021-22 to 2025-26, with an indicative outlay of ₹2.77 lakh crore and central assistance of ₹76,760 crore (a later ministry document gives the total as ₹2.99 lakh crore).[2][19] Its targets include 2.68 crore tap connections, 2.64 crore sewer connections, 20% of water demand met from recycled water and non-revenue water below 20%.[2] Cities with more than 10 lakh people must deliver at least 10% of project value through PPP.[2]

AMRUT 2.0 progressProjectsValueCapacity
Water supply3,528₹1,19,636 crore11,393 MLD treatment; 1.26 lakh km of network
Sewerage583₹66,118 crore6,650 MLD treatment; 1,932 MLD recycling

Data as of February 2026.[20]

Delivery lags approvals. By November 2025, 8,804 projects worth ₹1.93 lakh crore had been approved and work worth ₹1.21 lakh crore awarded, but only ₹47,411 crore of work was physically complete.[21] A parliamentary committee reported in August 2026 that the mission now ends on 31 March 2027 and that only 17.5% of sewerage projects were complete.[4] The central allocation for 2026-27 is ₹8,000 crore.[22]

A typical large AMRUT contract is SPML Infra’s ₹1,073 crore award in Indore in 2025: a 400 MLD water treatment plant and intake, built over 30 months and operated for 10 years.[23] By September 2024, 50 PPP projects worth ₹7,789 crore had been approved in 11 states.[24]

After AMRUT: the Urban Challenge Fund and municipal bonds

In February 2026 the Cabinet approved a ₹1 lakh crore Urban Challenge Fund for 2025-26 to 2030-31, intended to mobilise ₹4 lakh crore in total. The centre funds 25% of a project, cities must raise at least 50% through bonds, loans or PPP, and states or cities cover the rest. Water supply, sewerage and water grids are eligible, and there is a ₹5,000 crore credit guarantee scheme.[25]

Cities are also borrowing directly. Under AMRUT 2.0, 11 urban local bodies raised ₹1,719 crore through municipal bonds with ₹150.5 crore of central incentives,[21] and 13 bodies raised ₹4,984 crore over AMRUT’s ten years.[19] As more urban water projects are part-financed by markets rather than grants, bankable project structures, PPP and long operation contracts will matter more.

Procurement rules for foreign suppliers

  • No global tenders up to ₹200 crore. Rule 161(iv) of the General Financial Rules bars global tender enquiries for contracts up to ₹200 crore, including works and turnkey contracts, unless the Cabinet Secretariat approves an exception.[26]
  • Local content. Under the Public Procurement (Preference to Make in India) Order, Class I suppliers have at least 50% local content and Class II at least 20%. Below ₹200 crore only Class I and II suppliers can bid, and Class I suppliers get purchase preference.[27]
  • State rules. JJM and AMRUT tenders are issued by states and cities, which apply their own versions of these rules. Check each tender’s eligibility and local content clauses.

The practical result: on most contracts below ₹200 crore, a foreign company competes through an Indian subsidiary, a local manufacturing arrangement or an Indian partner, not as an importer. See our guides to joint ventures and choosing an Indian entity.

Where foreign water companies fit

If you offerThe opportunity
Pumps, valves, meters and pipesSupply to the EPC contractors on multi-village and urban schemes; solar pumping in remote villages, as Grundfos has done in Maharashtra[28]
Treatment technologyWater and sewage treatment plants under AMRUT and the larger JJM schemes, usually as technology partner to an Indian EPC contractor
Monitoring and IoTSensor-based monitoring was piloted with Tata Trusts in five states using flow meters, chlorine analysers and pressure sensors[29]
Water testingIndia had 2,847 drinking water testing labs, 1,678 of them accredited or recognised, in December 2025[30]
Operation and utility managementLong operation periods of 10–12 years on large schemes;[16][18] city-wide contracts such as Suez’s eight-year Mangaluru 24×7 water project funded by ADB[31]

The firms that do well in Indian water usually combine three things: a technology or operating skill that Indian contractors lack, a manufacturing or assembly base that meets local content rules, and an Indian partner with the track record to pre-qualify. Our partner search service finds and checks that partner.

Frequently asked questions

What is the Jal Jeevan Mission?

A central programme launched in August 2019 to give every rural household in India a functional tap connection. The centre shares the cost and states plan, tender and run the schemes. By March 2026 about 81.6% of rural households were connected.

Has the Jal Jeevan Mission been extended?

Yes. In March 2026 the Cabinet extended it to December 2028 with a total outlay of ₹8.69 lakh crore, including ₹3.59 lakh crore of central assistance, and shifted the focus to service delivery and operation and maintenance.

What is AMRUT 2.0?

The urban counterpart, approved in October 2021, funding water supply in 4,378 towns and sewerage in 500 cities, with targets for recycled water and non-revenue water. A parliamentary committee reported that it now ends in March 2027.

Can foreign companies bid for Jal Jeevan Mission projects?

Contracts up to ₹200 crore are normally closed to global tenders and favour suppliers with local content, so foreign firms usually take part through an Indian subsidiary, a local manufacturing arrangement or an Indian EPC partner, as technology or equipment suppliers or operators.

Who awards Jal Jeevan Mission contracts?

State agencies, usually the Public Health Engineering Department or a state water board or Jal Nigam. Large multi-village schemes are tendered as EPC contracts with long operation periods; small village schemes are often tendered at district level.

Related

Sources

  1. Lok Sabha, unstarred question on Jal Jeevan Mission coverage, February 2025
  2. PM India, Cabinet approves AMRUT 2.0, October 2021
  3. PM India, Cabinet approves extension of Jal Jeevan Mission to December 2028, March 2026
  4. Construction World, parliamentary panel urges MoHUA to expedite wastewater projects, August 2026
  5. ThePrint (PTI), more than 81% of rural households have tap water, January 2026
  6. Union Budget 2024-25, Demand No. 63
  7. Union Budget 2026-27, Demand No. 63, Department of Drinking Water and Sanitation
  8. PRS Legislative Research, Demand for Grants 2026-27 analysis: Jal Shakti, March 2026
  9. The Week (PTI), ASSOCHAM on pending Jal Jeevan Mission dues, October 2025
  10. Lok Sabha, question on Jal Jeevan Mission complaints, December 2025
  11. Deccan Herald, penalties on seven states for Jal Jeevan Mission irregularities, November 2025
  12. CAG, performance audit of Jal Jeevan Mission in Kerala, Report 10 of 2025
  13. ThePrint, CAG report on Jal Jeevan Mission in Punjab, March 2026
  14. Jal Jeevan Mission e-book, Annex VIII: third-party inspection
  15. CAG, audit of Jal Jeevan Mission in Chhattisgarh, 2026, chapter I
  16. Free Press Journal, L&T to build water supply project for 648 villages in Rajasthan, October 2023
  17. L&T, press release on water contracts in Uttar Pradesh, December 2021
  18. MEIL, foundation stone laid for Amarajeevi Jaladhara, December 2025
  19. MoHUA, ten years of AMRUT, June 2025
  20. Indian Infrastructure, progress under AMRUT, March 2026
  21. Lok Sabha, question on AMRUT 2.0 progress, December 2025
  22. Down To Earth, what Budget 2026 signals for water and sanitation, February 2026
  23. EA Water, SPML Infra wins Indore AMRUT 2.0 water project, October 2025
  24. Indian Infrastructure, interview with D. Thara on AMRUT 2.0, September 2024
  25. Business Today, Cabinet approves ₹1 lakh crore Urban Challenge Fund, February 2026
  26. Department of Expenditure, consolidated instructions on global tender enquiries under GFR Rule 161(iv), June 2021
  27. NTPC, circular implementing the revised Public Procurement (Preference to Make in India) Order, November 2020
  28. Grundfos, doorstep water for remote Indian villages, January 2024
  29. Deccan Herald, sensor-based IoT devices to monitor Jal Jeevan Mission
  30. Lok Sabha, question on drinking water testing laboratories, December 2025
  31. Republic World, Suez wins Mangaluru drinking water contract, December 2019

Talk to a partner about India

Tell us what you make or build and where you want to be in India. A partner reads every enquiry and replies within one working day.

UBR Infra · Worli, Mumbai
info@ubrinfra.com
+91 22 2492 7671







    By submitting, you agree that we may use these details to reply to you, as set out in our privacy policy. We do not sell your details or add you to mailing lists without asking.